The well was flowed back at a rate of 15 mmcf/d at 8000# FCP.  It has been flowing about a month and the water trucks have quit coming to pick up the recovered frac water. 

How long until they will shut the well in and install the production tubing?

At this point why even run tubing?

Views: 56

Reply to This

Replies to This Discussion

Jack, normally they install the production after a well has been producing ~ 2-4 months. You need the production tubing to maintain velocity as the well flow rate declines.

By the way, congratulations on a great well.
Congtrats to Jack Blake!