This discussion is continued from the Tuscaloosa Marine Shale Group.

http://www.gohaynesvilleshale.com/group/tuscaloosamarineshale/forum...

Link to SONRIS Lite well file:  http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2...

Views: 1079

Replies to This Discussion

Nabors Drlg Rig #X17 reported 44 days Drilling Ahead @ 17,804', 4/25/14

Nabors Drlg Rig #X17 reported 51 days Drilling Ahead @ 19,442'', 5/2/14

Should be to TD soon

1500' from max MD with final casing string still to be set.  With no set backs, maybe another week.

Excerpt from GDP presentation, May 6"

The Company has recently moved into completion operations on its Nunnery 12-1H #1 (94.1% WI) well in Amite County, Mississippi and its Beech Grove 94H #1 (66.7% WI) well in East Feliciana Parish, Louisiana, with plans to frac both wells in May;

Nabors Drlg Rig #X17 reported 58 days Drilling Ahead @ 19,771', 5/9/14.

GOODRICH PETROLEUM ANNOUNCES TUSCALOOSA MARINE SHALE ("TMS") WELL RESULT AND OPERATIONAL UPDATE

HOUSTON, June 18, 2014 /PRNewswire

EXCERPT

The Company has also completed frac operations, drilled out the frac plugs and will commence flow back on its Beech Grove 94H-1 (66.7% WI) well in East Feliciana Parish, Louisiana this week, with results expected by the end of June.  The Beech Grove well was drilled with an approximate 6,000 foot lateral and completed with 21 frac stages.   

Link to full article:  https://finance.yahoo.com/news/goodrich-petroleum-announces-tuscalo...

Any news on production?  Should be about time.

GDP will announce it before the completion report is filed with the state and becomes public record. 

HOUSTON, July 7, 2014 /PRNewswire/ -- Goodrich Petroleum Corporation (NYSE: GDP) today announced the completion of its Beech Grove 94H-1 (66.7% WI) well in East Feliciana Parish, Louisiana.  The well has achieved a peak 24-hour production rate to date of approximately 740 barrels of oil equivalent ("BOE") per day, comprised of 672 barrels of oil and 412 Mcf of gas on a 19/64 inch choke.  The Beech Grove 94H-1 well was drilled with an approximate 6,000 foot lateral, landed in the Company's lower target and was completed with 21 frac stages. 

RSS

Support GoHaynesvilleShale.com

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service