Docket 20-358, Hearing date 11/20/20, Comstock has created two new units in the Lake Bistineau Field, HA RA SU53

(Section 26 - 17N - 10W) and HA RA SU54 (Section 35 - 17N -10W and Section 2 - 16N- 10W) and applied for a HC well

drilled through all three sections with a theoretical lateral length of ~14,400 linear feet.  Only Chesapeake has drilled wells to

this Measured Depth in the past and only a few.  Extended laterals (where practical) and high intensity fracks seem to be the

future of Haynesville/Bossier development.

Views: 251

Reply to This

Support GoHaynesvilleShale.com

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service