Docket 20-358, Hearing date 11/20/20, Comstock has created two new units in the Lake Bistineau Field, HA RA SU53
(Section 26 - 17N - 10W) and HA RA SU54 (Section 35 - 17N -10W and Section 2 - 16N- 10W) and applied for a HC well
drilled through all three sections with a theoretical lateral length of ~14,400 linear feet. Only Chesapeake has drilled wells to
this Measured Depth in the past and only a few. Extended laterals (where practical) and high intensity fracks seem to be the
future of Haynesville/Bossier development.
Tags:
399 members
119 members
8 members
386 members
97 members
59 members
242 members
172 members
455 members
87 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com