SOUTHWIND AUS C SU80, MASTERS CREEK, RAPIDES PARISH - GoHaynesvilleShale.com2024-03-28T20:02:40Zhttps://gohaynesvilleshale.com/forum/topics/southwind-aus-c-su80-masters-creek-rapides-parish?groupUrl=austinchalk&commentId=2117179%3AComment%3A3793048&x=1&feed=yes&xn_auth=noSetting this plug (ezsv) insi…tag:gohaynesvilleshale.com,2018-12-19:2117179:Comment:37900452018-12-19T23:24:16.409ZRock Manhttps://gohaynesvilleshale.com/profile/MarkP
<p>Setting this plug (ezsv) inside casing plus placing massive amounts of cement points to operator sealing off this hole at this point and at least temporarily abandoning the operation right now.</p>
<p>There had been rumors of operator encountering some very high formation pressure in this part of the hole - this situation may have been to extreme to safely drill ahead right now.</p>
<p>However, setting this ezsv plug and associated cement could be part of setting up a "kick off point" to…</p>
<p>Setting this plug (ezsv) inside casing plus placing massive amounts of cement points to operator sealing off this hole at this point and at least temporarily abandoning the operation right now.</p>
<p>There had been rumors of operator encountering some very high formation pressure in this part of the hole - this situation may have been to extreme to safely drill ahead right now.</p>
<p>However, setting this ezsv plug and associated cement could be part of setting up a "kick off point" to drill hole in intermediate casing and start another new wellbore via sidetracking out of this hole.</p>
<p>Time will tell - there is a lot we DON'T know about what is happening out there and I doubt if more details will be forthcoming on SONRIS to clear the fog and answer all of your questions.</p> Gee, now all we need to for R…tag:gohaynesvilleshale.com,2018-12-19:2117179:Comment:37900422018-12-19T23:14:10.624ZSkip Peel - Mineral Consultanthttps://gohaynesvilleshale.com/profile/ilandman
<p>Gee, now all we need to for Rock Man or Jay to interpret all that! LOL! md is measured depth (the total length of the wellbore) and TVD is True Vertical Depth (self explanatory). Not sure of ezsv. rih is run in hole. Sqz is squeeze which means 250 bbls of cement (cmt) was pumped. Don't know about poo but suspect that it is pull out of hole. This sounds as if there was a problem drilling the curve and the driller is starting over.</p>
<p></p>
<p>Gee, now all we need to for Rock Man or Jay to interpret all that! LOL! md is measured depth (the total length of the wellbore) and TVD is True Vertical Depth (self explanatory). Not sure of ezsv. rih is run in hole. Sqz is squeeze which means 250 bbls of cement (cmt) was pumped. Don't know about poo but suspect that it is pull out of hole. This sounds as if there was a problem drilling the curve and the driller is starting over.</p>
<p></p> Also on 12/19/2018 well statu…tag:gohaynesvilleshale.com,2018-12-19:2117179:Comment:37900412018-12-19T22:56:24.425ZDavid Crocketthttps://gohaynesvilleshale.com/profile/LindaBodie
<p style="text-align: center;">Also on 12/19/2018 well status changes from 05 to 06. Measured depth says 15534 and under detail it says 12/19 waiting on orders, total depth 15,534md, 15,508 tvd</p>
<p style="text-align: center;">Also on 12/19/2018 well status changes from 05 to 06. Measured depth says 15534 and under detail it says 12/19 waiting on orders, total depth 15,534md, 15,508 tvd</p> I see where sonris has a new…tag:gohaynesvilleshale.com,2018-12-19:2117179:Comment:37901262018-12-19T22:52:42.378ZDavid Crocketthttps://gohaynesvilleshale.com/profile/LindaBodie
<p>I see where sonris has a new entry for this well. </p>
<p>12/18/2018. Plugback of current curve hole @ 65 deg, current depth 15,534 md/15,508 TVD Pick up a ezsv & rih to set at 14,647’ md inside intermediate casing. Sqz 250bbls 18.2 ppg cmt, 1.4 yield ft3/sk class h, 10 bbls of cmt will be placed on top of the ezsv poo</p>
<p>I see where sonris has a new entry for this well. </p>
<p>12/18/2018. Plugback of current curve hole @ 65 deg, current depth 15,534 md/15,508 TVD Pick up a ezsv & rih to set at 14,647’ md inside intermediate casing. Sqz 250bbls 18.2 ppg cmt, 1.4 yield ft3/sk class h, 10 bbls of cmt will be placed on top of the ezsv poo</p> Building on Skip's comment on…tag:gohaynesvilleshale.com,2018-12-19:2117179:Comment:37899732018-12-19T01:11:03.228ZRock Manhttps://gohaynesvilleshale.com/profile/MarkP
<p>Building on Skip's comment on my inquiry about plugging back et al - agree that this time period is all tied to drilling the curve and initially getting out from the vertical wellbore. Operator may be looking at a series of issues tied to formation pressure (and over pressure), kicks, wellbore control and long trip times tied to changing out bottom hole assemblies.</p>
<p>Building on Skip's comment on my inquiry about plugging back et al - agree that this time period is all tied to drilling the curve and initially getting out from the vertical wellbore. Operator may be looking at a series of issues tied to formation pressure (and over pressure), kicks, wellbore control and long trip times tied to changing out bottom hole assemblies.</p> Don't think so, Rock Man. No…tag:gohaynesvilleshale.com,2018-12-18:2117179:Comment:37896222018-12-18T13:27:58.206ZSkip Peel - Mineral Consultanthttps://gohaynesvilleshale.com/profile/ilandman
<p>Don't think so, Rock Man. No mention of plug back. Both reports mentioned drilling the curve.</p>
<p><b>SCOUT INFO</b></p>
<table border="1">
<tbody><tr><th>REPORT DATE</th>
<th>WELL STATUS</th>
<th>MEASURED DEPTH</th>
<th>TRUE VERT DEPTH</th>
<th>DETAIL</th>
</tr>
<tr><td>12/11/2018</td>
<td>05</td>
<td></td>
<td></td>
<td>12/11/18, <span style="text-decoration: underline;">DRILLING CURVE</span> @ 15396'</td>
</tr>
<tr><td>12/04/2018</td>
<td>05</td>
<td></td>
<td></td>
<td>12/2/18, TESTED…</td>
</tr>
</tbody>
</table>
<p>Don't think so, Rock Man. No mention of plug back. Both reports mentioned drilling the curve.</p>
<p><b>SCOUT INFO</b></p>
<table border="1">
<tbody><tr><th>REPORT DATE</th>
<th>WELL STATUS</th>
<th>MEASURED DEPTH</th>
<th>TRUE VERT DEPTH</th>
<th>DETAIL</th>
</tr>
<tr><td>12/11/2018</td>
<td>05</td>
<td></td>
<td></td>
<td>12/11/18, <span style="text-decoration: underline;">DRILLING CURVE</span> @ 15396'</td>
</tr>
<tr><td>12/04/2018</td>
<td>05</td>
<td></td>
<td></td>
<td>12/2/18, TESTED CAMERON BOP'S TO 250 PSI LOW & 10000 PSI HIGH FOR 30 MINS, TEST OK 12/4/18, <span style="text-decoration: underline;">DRILLING CURVE</span> @ 15026'</td>
</tr>
</tbody>
</table>
<p></p> Skip, it is possible that the…tag:gohaynesvilleshale.com,2018-12-18:2117179:Comment:37897032018-12-18T04:49:10.122ZRock Manhttps://gohaynesvilleshale.com/profile/MarkP
<p>Skip, it is possible that the time frame you were looking at (12/2 to 12/11) corresponded with the operator plugging back in the vertical hole and then kicking the well to start making curve to drill the lateral. Lots of tripping and non drilling time if this was the case.</p>
<p>Skip, it is possible that the time frame you were looking at (12/2 to 12/11) corresponded with the operator plugging back in the vertical hole and then kicking the well to start making curve to drill the lateral. Lots of tripping and non drilling time if this was the case.</p> The Crowell well reported 64…tag:gohaynesvilleshale.com,2018-12-18:2117179:Comment:37896922018-12-18T00:36:03.231ZSkip Peel - Mineral Consultanthttps://gohaynesvilleshale.com/profile/ilandman
<p>The Crowell well reported 64 days Drilling Ahead last Friday, 12/14, on the weekly RigData rig report. The rig has not been reporting depth on the weekly report. Out of curiosity I checked the SONRIS well file. Southwind reported the well at 15,026' on 12/2. Nine days later, 12/11, Southwind reported the well at 15,396'. 370' in nine days, or about 41' per day. This seems like a very low ROP.</p>
<p></p>
<p>The Crowell well reported 64 days Drilling Ahead last Friday, 12/14, on the weekly RigData rig report. The rig has not been reporting depth on the weekly report. Out of curiosity I checked the SONRIS well file. Southwind reported the well at 15,026' on 12/2. Nine days later, 12/11, Southwind reported the well at 15,396'. 370' in nine days, or about 41' per day. This seems like a very low ROP.</p>
<p></p> Good news on the Crowell 30 ?…tag:gohaynesvilleshale.com,2018-11-30:2117179:Comment:37852832018-11-30T13:19:44.172ZHydrocarbonitehttps://gohaynesvilleshale.com/profile/samuelmccaulley
<p>Good news on the Crowell 30 ? Reached TVD and preparing to drill lateral per Sonris report. SN 251311.</p>
<p>Good news on the Crowell 30 ? Reached TVD and preparing to drill lateral per Sonris report. SN 251311.</p> Thanks Jay, always appreciat…tag:gohaynesvilleshale.com,2018-11-18:2117179:Comment:37817622018-11-18T15:19:06.710ZHydrocarbonitehttps://gohaynesvilleshale.com/profile/samuelmccaulley
<p>Thanks Jay, always appreciate your input that keeps us up to date. Noticed when I drove by site they were already preparing next drill site just south of this one. But no permit on Sonris yet for that SU#76 unit. </p>
<p>Thanks Jay, always appreciate your input that keeps us up to date. Noticed when I drove by site they were already preparing next drill site just south of this one. But no permit on Sonris yet for that SU#76 unit. </p>