Building on Skip's comment on my inquiry about plugging back et al - agree that this time period is all tied to drilling the curve and initially getting out from the vertical wellbore. Operator may be looking at a series of issues tied to formation pressure (and over pressure), kicks, wellbore control and long trip times tied to changing out bottom hole assemblies.
399 members
119 members
8 members
386 members
97 members
59 members
242 members
172 members
455 members
87 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com