The Murray is producing, just not much. The 24 inch will not be fully functional until next week. It will have the capability of flowing south or north around the Clearlake area.
That line was finished a couple of weeks ago, although the new line from the RSD well to TGP Robeline will not open until this week. The (M. Murray)well is flowing, but just not very much right now becaues of high pressures I believe. The 24 inch to TGP at Robeline will help lower the line pressures. All of the wells in the in this area should be seeing lower pressures soon, therefore this should increase flow rates for all. Everything is looking good but gas prices!!
it came back up this week and is producing really good now. It was down about a week. Not sure what happened but it is back up and flowing. That exit to TGP is going to help all of these wells in this area.
Pelican
Oct 27, 2010
Pelican
Oct 27, 2010
Jack Blake
thanks,
JB
Oct 27, 2010
Pelican
Nov 8, 2010
Pelican
Nov 11, 2010