That is good that you are leased. Maybe they will do something down there before to long. I thought they would have already rebuilt the bridge going over the bayou. We got a letter from TXDOT that we signed letting them get on our land to do survey work. Our land borders the dirt road going to the bridge. I am not sure what the hold up is.
JWC
Aug 24, 2010
JWC
Aug 24, 2010
JWC
May 21, 2011