Ensign Drilling SW Rig 753 reported Assigned to the T Lewis 7-38H #1, 10/31.

Views: 1587

Replies to This Discussion

What the lastest on this well

There will not be another report until Friday (I'll post it Saturday).  Although the Ensign Drilling SW 753 reported that it was Assigned to the T Lewis last Friday, no projected spud date was given.

Ensign Drilling SW Rig 753 reported Moving On the T Lewis 7-38H #1, Projected Spud 11/10, 11/7.

Ensign Drilling SW Rig 753 reported Spud 11/14, 1 day Drilling Ahead @ 165', 11/14.

Ensign Drilling SW Rig 753 reported Spud 11/14, 8 days Drilling Ahead @ 3,630'', 11/21.

Ensign Drilling SW Rig 753 reported Spud 11/14, 15 days Drilling Ahead @ 11,045', 11/28.

What's the latest on this well

Friday, john.

Ensign Drilling SW Rig 753 reported Spud 11/14, 22 days Drilling Ahead, 12/5.

whats news on this well as today

need some info on this well

The  T LEWIS 7-38H #1 does not appear in the rig report after 12/5.  The Ensign SW Rig 753 was dropped by GDP.  I think it is safe to assume that the well is drilled but waiting on completion. I don't find any mention of the well in the most recent press releases.

RSS

Support GoHaynesvilleShale.com

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service