EOG tested the ACLCO Unit #1H with an IP of 33.092 MMcfd on a 32/64 choke with a flowing casing pressure of 7,636 psi and a shut-in pressure of 11,015 psi

Tags: Drilling, EOG, East, Nacogdoches, Texas

Views: 689

Replies to This Discussion

Thanks for the report j garrett.  They had a rig on Michelle Unit last week up north of Blackbird.  I think Penny Lane is finished drilling.
Atkinson 1H Reported last week at 15,165 MCF and about 4,300 psi which looks to be another Bossier well. At the same time the Sutton 1H reported about 23,000 MCF and about 5,400 psi which looks to be a Haynesville well.

RSS

© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service