Tags:
Permalink Reply by Frank Coday on October 28, 2010 at 4:30
Permalink Reply by Frank Coday on November 23, 2010 at 11:47 It's a 125 gallon per minute Amine plant with a glycol contactor. The unit is used to take H2S, CO2 and Water out of the gas and the plant equipment is being leased by Tenaska. There is a possibility that Tenaska will build a permanent plant there before the lease is up on the 125 GPM plant.
Permalink Reply by ALongview on December 24, 2010 at 5:53 Most likely a smaller Amine/Glycol plant. I just finished my part of a temporary 250 GPM Amine/Glycol plant near Carthage on a large site and Tenaska plans to build 2 permanent plants on the same location.
We are scheduled to do a 70 GPM Amine/Glycol plant near Nacogdoches Tx in a few weeks and I bet the 5 acre tract you talk about will be for a Amine/Glycol plant in the same size range. This is just a guess though, I'm only privy to locations once the contracts are let and the company I work for is awarded the erection contract from the unit owner (who leases the plants to Tenaska.
441 members
248 members
690 members
455 members
7 members
6 members
7 members
386 members
402 members
194 members
In researching the decades-old Tuscaloosa Trend and the immense wealth it has generated for many, I find it deeply troubling that this resource-rich formation runs directly beneath one of the poorest communities in North Baton Rouge—near…
ContinuePosted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2025 Created by Keith Mauck (Site Publisher).
Powered by
| h2 | h2 | h2 |
|---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com