It's a 125 gallon per minute Amine plant with a glycol contactor. The unit is used to take H2S, CO2 and Water out of the gas and the plant equipment is being leased by Tenaska. There is a possibility that Tenaska will build a permanent plant there before the lease is up on the 125 GPM plant.
Most likely a smaller Amine/Glycol plant. I just finished my part of a temporary 250 GPM Amine/Glycol plant near Carthage on a large site and Tenaska plans to build 2 permanent plants on the same location.
We are scheduled to do a 70 GPM Amine/Glycol plant near Nacogdoches Tx in a few weeks and I bet the 5 acre tract you talk about will be for a Amine/Glycol plant in the same size range. This is just a guess though, I'm only privy to locations once the contracts are let and the company I work for is awarded the erection contract from the unit owner (who leases the plants to Tenaska.
68 members
478 members
194 members
11 members
405 members
18 members
250 members
457 members
11 members
388 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by