This is just a common O&G operator phrase indicating that it will take them three years of drilling to get to a certain point in time - probably tied to a perceived optimum understanding of the play.
This 3 year plan may be what the operator thinks is the time needed to drill enough well to get all the key acreage HBP (held by production)
Did they mention the number of rigs that they will be using in this plan?
63 members
386 members
399 members
119 members
8 members
97 members
59 members
242 members
172 members
455 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com