The Ensign US Drilling SW Rig #751 is reported this date as Assigned. 

Views: 11132

Replies are closed for this discussion.

Replies to This Discussion

I was there Saturday and they were just circulating.  I couldn't figure out what they were doing and didn't try to ask anyone.

I did notice about 200 intermediate casing pipes staged for use, so I'm assuming that will be installed shortly.

Ensign US Drilling SW Rig #751 reports 34 days drilling @ 11,917', 12/27.

 Humm... if Lawson is at 11,400 after 15 days and CMR is still at 11,917 in 34 days, they seem to be lingering a  at the curve on the CMR. The curves can be a challenge. Anyone notice any "new equipment" arriving at the CMR ?

The CMR has just recommenced drilling after setting casing.  Probably some other non-drilling housekeeping also such as testing the BOP.

Optimism is good. I feel better. :)

Any updates for this week?

They should half way or so of the lateral drill, I would think.

Ensign US Drilling SW Rig #751 reports 41 days drilling ahead @ 13,015', 1/3/14.

Thanks.

Any word on a rig being moved onto the Lyons 35H in west Amite County?

I went by there tonight and it appeared a rig was moving in.

The Trinidad 124 and the Ensign 751 are the only rigs reporting in Amite County.

Interesting.

They could be lost and think they are in Wilkinson County or just haven't reported the move.

I'm guessing it is a Trinidad rig.

Could be.  Did it have this color scheme? No rigs reporting in Wilkinson.

http://www.trinidaddrilling.com/Rigs/RigDetails.aspx?ID=dd3b8d47-74...

I didn't see the color scheme of the rig...just a house/shed on a trailer and other equipment scattered about . 

Another party suggested it was a Trinidad rig.