The following is a snapshot of the sections that are, in whole or in part, included in TMS Drilling & Production units.

1N-2E:   3,4,5,13,14,19,20,22,24,28(HBP),31(HBP),35,36,40 (HBP)

1N-3E:   40 (D),41,42,43,45 (D),46,47

1N-4E:   5 (HBP),6,7(D),8 (HBP),18 (D),28 (HBP),33 (HBP),38

1N-5E:   4,6 (HBP),7 (HBP),8 (HBP),9,13,16 (HBP)17 (HBP),18 (HBP),18,19,20,21,24,25,25 (HBP),28,29(D),30,31,32 (D),33,36 (HBP),37 (HBP)

1N-6E:   5 (HBP),6,19,20,21,28,29,30,31,32,33

2N-2E:   15,16,24 (D),26,28,29,33,35 (D),38,39,41

2N-3E:   1,4 (HBP), 9 (HBP)12,13 (HBP),14,20,21,36,37

2N-4E:   26,29,42

2N-5E:   7 (HBP),18 (HBP),33

2N-6E:   1 (HBP),12 (HBP),19 (HBP),25,29 (HBP),30 (HBP),31,32

3N-4E:   24 (D),25 (D)

*            By Section

               HBP (Held By Production - Existing Producing Well)

               D (Currently Drilling)

Views: 1343

Replies to This Discussion

What is HBP?

Held By Production.  A common industry term for lands that have existing production which holds the leases in force.  Those sections noted as HBP already have a completed well.

Here is my confusion.  In 2N 3E sections 12 & 13 there are no completed wells.  There is current drilling but the rig just spudded last week.  Am I missing something?

William, the reason I put "in whole or in part" in the discussion title is because there are a number of instances where only part of a section is included in a drilling unit and indeed instances where portions of a section may be included in more than one unit.  In the case to which you refer a portion of Section 13 is included in the unit for the completed Joe Jackson 4-13H and a portion in the permitted but not yet drilled Sabine 12H comprised of all or portions of Sections 1, 12, 13 & 14, 

Thanks for the explanation.

You're welcome.  Trinidad Drilling Rig 125 spud the Sabine 12H #2 6/22.

How do they drill 2 wells at the same time with one rig?  !2H-1 was spudded on the 19th and now 12H-2 on the 22nd.  Didn't think that was possible.

You think correctly.  I went back through the weekly rig reports and didn't find an entry for the #1, only the #2.  I don't show the #1 spud in my spreadsheet. Probably my typo from the report..  Thanks for the heads up.

Sec. 13, T2N, R3W is not in the Joe Jackson 4H-1 & 4H-2 unit.  Secs. 4 & 9 are.

James, I didn't say Section 13 was in the Joe Jackson 4H #1 & #2.  I said it was in the Joe Jackson 4-13H. The 4-13 was completed back in May, 2008.

1N 5E sections 21,28,&33 are not HBP or drilling they are permitted in the Smith28H

Barry, those sections are not followed by a "D" or "HBP".  They are, as my discussion title indicates, included in a TMS unit. 