Attached is the Southern Region presentation, which includes the Haynesville Shale, from QEP's Analyst Meeting.
QEP plans to lower their operated drilling rig count for the Haynesville to only two in 2012.
On Slide 20 QEP shows depicts a possible 40-acre pilot project to determine if additional horizontal wells are required in the upper and lower portions of the Haynesville Shale to optimize gas recovery. QEP said this pilot would not occur before 2013 at the earliest.
Tags:
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
101 members
150 members
400 members
358 members
166 members
9 members
120 members
97 members
34 members
386 members
© 2025 Created by Keith Mauck (Site Publisher).
Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com