Does anyone know the current status of Chesapeake's Harvey #1 located NE of Center?

Views: 433

Replies to This Discussion

It is up and they are drilling last friday about 10 salt water trucks went down there. I heard they were planing to drill a lot of holes on the same location.
If by "same location" do you mean on the same H. Ashabranner Survey?
Can anyone give us a current report on the Harvey #1 ?
I would also like to know if there's any update on this well?
Surely someone knows the present status of the HARVEY #1. Please give us an update if you do. Thanks
well was spud March 6---On Baker Hughes Rig Count Web Site GPS update today 5/21 looks like the rig is still on the Harvey #1 site. If so they have been drilling ~ 11 weeks which is long time. Have they run into problems???? On shale wells the rig moves off at TD then well is segmentally plugged and fac for production. Any one live in area and gone by the site to see if rig still on site?? This will be best info at present time. Any one been down to check let us know....
There was all kinds of trucks going to the Harvey 1 this weekend with diffrent types of equipment being hauled in. Two of the trucks had two big white tanks on each. This morning when I was leaving for work, two trucks hauling pipe was headed out from the rig. I told my husband, something was going on, I never seen so much traffic. One crew drove up to our house looking for the rig.
I just talked with a family member who lives on CR 3230, and he said that there is a lot of traffic - tankers and other vehicles and trucks - but that it's been this way since March. Didn't think it was a dramatic difference, that it's been busy steadily. Wouldn't tankers going in and out lead you to believe they're getting something out?
lajeany----Is the big drilling rig still on site? It will move off before they start to work on completion.
They were moving out this weekend May 30th & 31st. I know they hit gas, but they had not fraced when I talked with someone.
Lajeany---Thanks for info, so they just completed drilling after 12 weeks; must have had some problems hope nothing major that would scare them off from drilling more in the area. They should now bring in completion crew to pump down the segment packs and fac it for completion. This I beleive should take about two weeks or so. Then they need pipeline to connect to. Since you are in area please keeps us updated as you see developments. THANKS
Lajeany------What activity to you see going on on the Harvey #1H site since rig moved off? When the last time you when by site? Thanks for any update

RSS

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service