Nabors Drilling Rig 624 spud the 8H #2 9/19. Reported 15 days Drilling Ahead 11,120'.
Nabors Drilling Rig 624 reported 3 days Drilling Ahead @ 5651' on the #1, 10/10.
Nabors Drilling Rig 624 reported 10 days Drilling Ahead @ 11605' on the #1, 10/17.
Nabors Drilling Rig 624 reported 17 days Drilling Ahead @ 11,995' on the #1, 10/24.
Nabors Drilling Rig 624 reported 10/24 Assigned to the #2 with projected spud date of 11/1.
As always, thanks Skip. Is there anyway to understand if they will go back to drilling the #1 at some point in time or do they expect to be finished with it? The depth reported above does not seem like the total desired depth? Sorry for so many questions.
Yes, they will re-enter the #1 at some point. Seems to me that the #1 reported depth would be where the intermediate casing string would be set. I haven't read any statements by TMS operators regarding the advantage of drilling two wells simultaneously and moving back and forth between them. I can't think of any obvious advantage to the strategy from a drilling stand point. If I had to guess I'd say that the advantage may be one of scheduling completion crews and having two wells to frac sequentially in the same location.
Thanks Skip, always appreciate the time and information.
Nabors Drilling Rig 624 reported 24 days Drilling Ahead @ 12,364' on the #1, 10/31.
Nabors Drilling Rig 624 reported 31 days Drilling Ahead @ 15,745' on the #1, 11/7.
Nabors Drilling Rig 624 reported Assigned to the #2 with Projected Spud 11/14, 11/7.
The History of GoHaynesvilleShale.com
GoHaynesvilleShale.com (GHS) was launched in 2008 during a pivotal moment in the energy industry, when the Haynesville Shale formation—a massive natural gas reserve lying beneath parts of northwest Louisiana, east Texas, and southwest Arkansas—was beginning to attract national attention. The website was the brainchild of Keith Mauck, a landowner and entrepreneur who recognized a pressing need: landowners in the region had little access to…
ContinuePosted by Keith Mauck (Site Publisher) on May 21, 2025 at 6:00
246 members
121 members
193 members
146 members
400 members
101 members
150 members
358 members
166 members
9 members
© 2025 Created by Keith Mauck (Site Publisher).
Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com