COMPLETED 8/27/15; GAS; CV RC; 15416 MCFD; 26/64 CHOKE; 60 BOCD, 58 GVTY; 6500# FP; PERF 11090-15509' MD, 4419' LATERAL
It can take a few months for a Division Order review to be completed. If you haven't received one by the end of the month you should contact Nadel & Gussman.
Much of the Choudrant Field area is under lease and a handful of exploratory wells have been drilled. Without existing infrastructure and at current low prices I don't expect much additional activity in 2016. Most of the leases are relatively early in their terms so that N&G and MRD, the main operator, have a couple of years window to explore and develop that area.
The Williams is a good well. It's initial flow test produced 15.416 MMcfd (million cubic feet per day), 60 BOCD (barrels of condensate per day), on 26/64" choke setting (about 3/8ths. of an inch opening) with 6500 pounds of Flowing Pressure (good pressure) and a horizontal lateral of 4419' (about the maximum length for the size of the unit).
307 members
409 members
286 members
6 members
49 members
© 2026 Created by Keith Mauck (Site Publisher).
Powered by