COMPLETED 8/27/15; GAS; CV RC; 15416 MCFD; 26/64 CHOKE; 60 BOCD, 58 GVTY; 6500# FP; PERF 11090-15509' MD, 4419' LATERAL
It can take a few months for a Division Order review to be completed. If you haven't received one by the end of the month you should contact Nadel & Gussman.
Much of the Choudrant Field area is under lease and a handful of exploratory wells have been drilled. Without existing infrastructure and at current low prices I don't expect much additional activity in 2016. Most of the leases are relatively early in their terms so that N&G and MRD, the main operator, have a couple of years window to explore and develop that area.
The Williams is a good well. It's initial flow test produced 15.416 MMcfd (million cubic feet per day), 60 BOCD (barrels of condensate per day), on 26/64" choke setting (about 3/8ths. of an inch opening) with 6500 pounds of Flowing Pressure (good pressure) and a horizontal lateral of 4419' (about the maximum length for the size of the unit).
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
386 members
27 members
455 members
440 members
400 members
244 members
149 members
358 members
63 members
119 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |