The following is excerpted from several online articles about how newer frac designs are being adopted by the industry.

The early Haynesville Shale well designs had costs that were about 50% drilling and 50% completing (fracking).  As drilling has become more cost efficient and fracking has constituted a considerably greater portion of well cost, the industry has innovated to improve fracking technology and reduce the cost.  Here are the three current types of fracs.

ZIPPER FRAC – SIMUL-FRAC – TRIMUL-FRAC

Zipper fracking is a hydraulic fracturing technique used in shale development to improve production and operational efficiency in multi-well completions: 

  • Process: Involves fracturing two or more parallel horizontal wells in a staggered pattern, alternating between the wells. 

Benefits: Improves operational efficiency by reducing downtime between stages, and can increase production rates and ultimate recovery rates. 

Name: Named for the zipper-like configuration of the fracture stages. 

Origin: Developed by Texas Tech University. 

Industry adoption: Has been adopted by companies in the Eagle Ford shale of south Texas. 

Zipper fracking works by:

Drilling multiple wells from a pad site 

Pumping one well while the other performs wireline operations 

Redirecting the pumps to frac the well that was just prepared with wireline 

The fractures in each cluster propagate towards each other, forcing fracture propagation in a direction perpendicular to the main fracture. 

___________________________________________________________________

 

What is Simul-Frac and Trimul-Frac?

  • Simul-frac (simultaneous fracturing) involves fracturing two wells at the same time, significantly streamlining operations compared to traditional zipper-frac methods, where wells are fractured one after the other.

____________________________________________________________________

  • Trimul-frac takes this efficiency a step further by fracturing three wells simultaneously, further cutting costs and speeding up well completion times.

Cost Savings and Efficiency Gains

One of the key advantages of simul-frac and trimul-frac operations is the cost savings per well:

Views: 182

Reply to This

Replies to This Discussion

Exxon’s Custom, Lightweight Proppant Boosts Permian EURs by 15%

Hart Energy

Exxon is lowering drilling and completion costs, boosting EURs by 15% with custom proppant and considering upside from less developed Permian Basin zones.

As Exxon Mobil boosts Permian Basin recovery and lowers drilling and completion (D&C) costs, the U.S. supermajor could look to target projects in the basin’s emerging secondary benches.

The Spring, Texas-based company is also deploying its own secret ingredient to ramp up recoveries: Its custom-made proppant is booting EURs by 15%.

Exxon Mobil is also seeing secondary Permian intervals—including the lower Wolfcamp benches, Mississippian benches and the Jo Mill Formation—become “highly economic” with lower drilling costs, senior vice president Neil Chapman said during the company’s Dec. 11 corporate update.

 

RSS

Support GoHaynesvilleShale.com

Blog Posts

Tuscaloosa Trend Sits On Top Of Poorest Neighbourhood For Decades - Yet No Royalties Ever Paid To The Community -- Why??

In researching the decades-old Tuscaloosa Trend and the immense wealth it has generated for many, I find it deeply troubling that this resource-rich formation runs directly beneath one of the poorest communities in North Baton Rouge—near Southern University, Louisiana—yet neither the university ( that I am aware of)  nor local residents appear to have received any compensation for the minerals extracted from their land.

This area has suffered immense environmental degradation…

Continue

Posted by Char on May 29, 2025 at 14:42

Not a member? Get our email.

Groups



© 2025   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service