For those following the above step out well, GEP drilled a short one mile lateral and released the rig and it moved over to their other step out in Pendelton Many.
Tags:
Thanks for the update, Dale. Please consider posting this on the Natchitoches Parish group page.
https://gohaynesvilleshale.com/group/natchitochesparishnetwork
Both the Robeline well and the Many well should be in the flowback stage soon. They are both very long step outs from production.
Thanks, Dale. Fingers crossed.
68 members
478 members
194 members
11 members
405 members
18 members
250 members
457 members
11 members
388 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by