For those following the above step out well, GEP drilled a short one mile lateral and released the rig and it moved over to their other step out in Pendelton Many.
Tags:
Thanks for the update, Dale. Please consider posting this on the Natchitoches Parish group page.
https://gohaynesvilleshale.com/group/natchitochesparishnetwork
Both the Robeline well and the Many well should be in the flowback stage soon. They are both very long step outs from production.
Thanks, Dale. Fingers crossed.
307 members
409 members
286 members
6 members
49 members
© 2026 Created by Keith Mauck (Site Publisher).
Powered by