On 01-24-11 I received a certified letter and a phone call from Enbridge regarding construction of a new 16" pipeline on my property (off FM 138 and off CR 1520 in Shelby County). 

On 01-28-11 I met the Enbridge represenative on my land to discuss this issue, only to find Enbridge had already surveyed my land for 6+ acres for 3 hydro units.  The Enbridge rep said he knew the letter was in error (no one from Enbridge has bothered to correct this error or discuss it with me) and that Enbridge Pipeline ALWAYS enters land and surveys it if they are interested in constructing anything (pipeline, hydro, compressors, etc).

I gave Enbridge my $ figure and was told they would be back in touch the following week.  As of today, no one from Enbridge has contacted me regarding this issue.

Anyone know anything about the 3 new hydro units Enbridge wants to build?  What about Enbridge entering and surveying on my land without permission?

Views: 61

Reply to This

Support GoHaynesvilleShale.com

Blog Posts

History of GoHaynesvilleShale

The History of GoHaynesvilleShale.com

GoHaynesvilleShale.com (GHS) was launched in 2008 during a pivotal moment in the energy industry, when the Haynesville Shale formation—a massive natural gas reserve lying beneath parts of northwest Louisiana, east Texas, and southwest Arkansas—was beginning to attract national attention. The website was the brainchild of Keith Mauck, a landowner and entrepreneur who recognized a pressing need: landowners in the region had little access to…

Continue

Posted by Keith Mauck (Site Publisher) on May 21, 2025 at 6:00

Not a member? Get our email.

Groups



© 2025   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service