SWN permitted the L SMK RA SUA; Doles 30 -22- 1W #1-Alt, S30 - 22N - 1W, Ora Field, Union Parish today. The first alternate well is an indication that SWN now believes they have an area of focus to prove the Brown Dense economic.
http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2...
Tags:
Permalink Reply by North LA on July 19, 2012 at 8:57 same thing and it looks to be about 9,500ft long lateral
Permalink Reply by Flying High on July 19, 2012 at 9:01 Lateral a
Permalink Reply by Bradley McWilliams on July 19, 2012 at 11:29 Quick lesson, a "lateral" is the horizontal portion of a well. Therefore, if it has a lat, it's a horz well. The two types in this area is either horz or vertical.
Permalink Reply by B Kenner on July 20, 2012 at 3:44 Love this lesson of the day!!!! Then this means this will be the second horizontal in these sections.
Permalink Reply by obed w odom on July 20, 2012 at 3:51 You're right, and the lateral for the Doles well will be about twice as long as the one for the BML well. It will be interesting to see if such a long lateral will present technical problems, but I certainly hope not. Go SWN!
Permalink Reply by Bradley McWilliams on July 20, 2012 at 6:40 Today's lesson- It's too stinking hot out!
Permalink Reply by Barbara Keene on July 20, 2012 at 12:00
Permalink Reply by North LA on July 20, 2012 at 12:55 Yes they were, but the unexpected oil kick ruined the plan and they decided to cut the lateral short.
Permalink Reply by Barbara Keene on July 20, 2012 at 13:30
Permalink Reply by North LA on July 20, 2012 at 14:02 I don't know for sure, but I would assume since they are saying they want a 9,000+ft lateral.
Permalink Reply by obed w odom on July 24, 2012 at 6:16 Latest SONRIS Lite report (7/24/2012): 7/20/12, SET 13 3/8" CASING AT 2065' WITH 1122 SACKS OF CEMENT. 7/21/12, TEST CAMERON BOP TO 5000 PSI FOR 30 MINUTES. TEST OK. 7/23/12, DRILLING AHEAD AT 2588'.
http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2...
Permalink Reply by obed w odom on July 30, 2012 at 18:11 SONRIS Lite report of 7/30/2012:
07/30/12: DRILLING AHEAD @ 8501'.
http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2...
12 members
456 members
10 members
405 members
17 members
248 members
8 members
67 members
301 members
121 members
In researching the decades-old Tuscaloosa Trend and the immense wealth it has generated for many, I find it deeply troubling that this resource-rich formation runs directly beneath one of the poorest communities in North Baton Rouge—near…
ContinuePosted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by
| h2 | h2 | h2 |
|---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com