SWN permitted the L SMK RA SUA; Doles 30 -22- 1W #1-Alt, S30 - 22N - 1W, Ora Field, Union Parish today. The first alternate well is an indication that SWN now believes they have an area of focus to prove the Brown Dense economic.
http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2...
Tags:
same thing and it looks to be about 9,500ft long lateral
Lateral a
Quick lesson, a "lateral" is the horizontal portion of a well. Therefore, if it has a lat, it's a horz well. The two types in this area is either horz or vertical.
Love this lesson of the day!!!! Then this means this will be the second horizontal in these sections.
You're right, and the lateral for the Doles well will be about twice as long as the one for the BML well. It will be interesting to see if such a long lateral will present technical problems, but I certainly hope not. Go SWN!
Today's lesson- It's too stinking hot out!
Yes they were, but the unexpected oil kick ruined the plan and they decided to cut the lateral short.
I don't know for sure, but I would assume since they are saying they want a 9,000+ft lateral.
Latest SONRIS Lite report (7/24/2012): 7/20/12, SET 13 3/8" CASING AT 2065' WITH 1122 SACKS OF CEMENT. 7/21/12, TEST CAMERON BOP TO 5000 PSI FOR 30 MINUTES. TEST OK. 7/23/12, DRILLING AHEAD AT 2588'.
http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2...
SONRIS Lite report of 7/30/2012:
07/30/12: DRILLING AHEAD @ 8501'.
http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2...
68 members
478 members
194 members
11 members
405 members
18 members
250 members
457 members
11 members
388 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by