Docket 20-358, Hearing date 11/20/20, Comstock has created two new units in the Lake Bistineau Field, HA RA SU53
(Section 26 - 17N - 10W) and HA RA SU54 (Section 35 - 17N -10W and Section 2 - 16N- 10W) and applied for a HC well
drilled through all three sections with a theoretical lateral length of ~14,400 linear feet. Only Chesapeake has drilled wells to
this Measured Depth in the past and only a few. Extended laterals (where practical) and high intensity fracks seem to be the
future of Haynesville/Bossier development.
Tags:
68 members
478 members
194 members
11 members
405 members
18 members
250 members
457 members
11 members
388 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by