Does anyone know the projected date of this well going online?
Tags:
Cindy, it would be helpful to have additional information. For example, where is the well located, Louisiana: section-township-range? Texas: survey name and number. If you have a lease that location description will be in the legal description of the tract of land. Operator, what company drilled the well? What parish or county?
API # 419-31740 XTO Energy Well 1HB New Drill Total Depth 21500
Shelby County Texas, Lease name is Murray
Status # 766153
Does that help any
Beats the heck out of just Murray. LOL!
Cindy, the well is drilled and waiting on completion.
The lateral still needs to be perforated and frac'd. It will not produce gas until that is done. The well has to be tied into the gathering system (pipeline), as well, and that is usually done before frac'ing. A gathering line has to be extended out to the new well.
How long does that usually take for all that to happen?
68 members
478 members
194 members
11 members
405 members
18 members
250 members
457 members
11 members
388 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by