Does anyone know the projected date of this well going online?
Tags:
Cindy, it would be helpful to have additional information. For example, where is the well located, Louisiana: section-township-range? Texas: survey name and number. If you have a lease that location description will be in the legal description of the tract of land. Operator, what company drilled the well? What parish or county?
API # 419-31740 XTO Energy Well 1HB New Drill Total Depth 21500
Shelby County Texas, Lease name is Murray
Status # 766153
Does that help any
Beats the heck out of just Murray. LOL!
Cindy, the well is drilled and waiting on completion.
The lateral still needs to be perforated and frac'd. It will not produce gas until that is done. The well has to be tied into the gathering system (pipeline), as well, and that is usually done before frac'ing. A gathering line has to be extended out to the new well.
How long does that usually take for all that to happen?
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
9 members
120 members
97 members
34 members
386 members
27 members
455 members
440 members
400 members
244 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com