Sections 22&27 in 9 North - 9 West.  Please spread the word.  We have had reports of GEPH II and Expand Energy leasing in the Robeline Field.

https://sonlite.dnr.state.la.us/dnrservices/redirectUrl.jsp?dDocnam...

Views: 3113

Replies to This Discussion

Expand is moving a rig in to sections 27&34 in 9 north-8 west this weekend 

They must feel pretty confident that they’re not waiting on the 3-D seismic to be completed

Well # 255786 Looks like they P&A well at 17122’

Hard to say if that is a typo considering what comes before it and the fact that the well is still listed as Status Code 31.  Also there is no work order for a P&A.  The status is dated today.

09/22/2026 31 17122 SCOUT CODE 31: 9/15/2026 TUES. 6:00 AM - TRIP IN HOLE TO 15,606'. DRILL 10' OF NEW FORMATION TO 15,616'. CIRCULATE HOLE CLEAN. PERFORM 18# FIT. DRILL PILOT HOLE TO 15,780'; 9/16/2026 WED. 6:00 AM - DRILL PILOT HOLE FROM 15780' TO 17,070'.; 9/17/2026 THURS. 6:00 AM - DRILL PILOT HOLE FROM 17,070' TO 17,122'. CIRCULATE HOLE CLEAN. BACK REAM OUT TO 16,800'. TOOH TO 12,500. TIH TO 15,500'. WASH AND REAM IN HOLE TO 17,122'. CIRCULATE HOLE CLEAN. BACK REAM OUT OF HOLE TO 16,800'. TOOH TO 500'. ; 9/18/2026 FRI. 6:00 AM - LAY DOWN BHA, PULL WEAR BUSHING, INSTALL & TEST WIRELINE LUBRICATOR, RIG UP & RUN OPEN HOLE WIRELINE LOGS, RIG DOWN WIRELINE. MAKE UP BIT & BIT SUB, TRIP IN HOLE TO 5,000'.; 9/19/2026 SAT. 6:00 AM - TRIP IN HOLE TO 15,603'. WASH AND REAM IN HOLE TO 17,122'. CIRCULATE HOLE CLEAN. TRIP OUT OF HOLE TO BHA. LAY DOWN CLEAN OUT ASSEMBLY. RIG UP WIRELINE LOGS; 9/20/2026 SUN. 6:00 AM - RUN OPEN HOLE WIRELINE LOGS, TRIP IN HOLE 4.5" DRILL PIPE TO 9,600', LAY DOWN 4.5" DRILL PIPE TO 6,000'.; 9/21/2026 MON. 6:00 AM - LAY DOWN REMAINING 4.5" DRILL PIPE, RIG UP & RUN WIRELINE BP GAUGE RING. P&A WELL

No reference to setting any plugs - which should be necessary for any permanent P&A.

Still thinking this is temporary

I thought the HZ portion was a risky proposal without the benefit of the ongoing 3D shoot.  My guess is that got the vertical hole log and core data and decided to wait on the survey for lateral placement or other go forward plans.  Very little well control this far east.  

That makes sense.  I doubt there are plans to plug and abandon the well.  It can remain Status 31 indefinitely.

Status shows future utility, so I would assume they will take it HZ later.  

Well is continually referred to as "pilot hole" in SONRIS. This could be a temporary abandonment that allows operator to figure out what to do with this wellbore after analyzing all the logs and any other data.

Has anyone seen any leasing in T 9N-8W Sec 14?  Looks like almost everything west & south of there is leased.  

William, no one has reported leasing in Section 14 to me.  I only make note of what members post here on the website.  My spreadsheet for 9N-8W shows leasing in the following sections:  17, 20 & 33.  I'm sure there are other sections leased but I have not attempted a search of Natchitoches public records and that is the only way to know for sure.  There is the existing Haynesville unit covering 27&34 which I show as having one well permit.

RSS

© 2026   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service