EOG included the following information in their 2009 Operational Highlights:
"In an area where EOG had previously focused on the Haynesville, EOG reported strong production results from its first Bossier natural gas test. The Sustainable Forest 5 - No. 2 Alt., drilled to a vertical depth of 11,400 feet in the Trenton prospect area in DeSoto Parish, La., began producing at 13 million cubic feet per day. EOG has 100 percent working interest in the well that is estimated to have reserves in excess of 8 billion cubic feet. EOG is currently operating five rigs in the Trenton prospect where it is drilling and developing both the Bossier and Haynesville reservoirs concurrently."
EOG's presentation actually shows the well testing at 13.1 MMcfd. This test rate plus EOG's estimate of 8+ Bcf for the well confirms the Bossier Shale play has great potential in portions of North Louisiana and East Texas. This announcement of concurrent development of the Bossier Shale and Haynesville Shale by EOG helps explain the multiple well permits in this section.
EOG, Sustainable Forest 5 #2A Well, Serial #240171, S5-T11N-R12W
Tags:
409 members
307 members
286 members
6 members
49 members
691 members
253 members
7 members
549 members
20 members
Posted by don burkett on September 17, 2026 at 10:08
© 2026 Created by Keith Mauck (Site Publisher).
Powered by