De- Risking Northern Sabine County, Texas Now

There will be a well drilled to the Haynesville by Chesapeake Energy that will de risk the Haynesville and Middle Bossier soon. This well should be a very good well in both zones mentioned.The northern part of this county will be very active from now on until fully developed.

Posted by Jurassic Exploration Inc on 27 May 2010 01:35

Views: 173

Replies to This Discussion

Plan to take a look around today. Will advise if anything new.
Frank, Any Luck?
ALongview, nothing really new. Most of Hall line "in the ground". At telephone Rd. 12/24"transition, above ground fabrication indicates a 24" west tie in which would be the Tenaska line and a lot of new survey stakes on Hwy. 87 @ crossing point to west. Hall site - Road to compressor station has been improved w/gravel. Went on up Reeves Rd. to CHK site & still drilling. Don't know which one they are drilling on now. Came down 2261 to 87 and new pad in works 1&1/2 mi. East of Hwy. 87 and access Rd. started on east side of 87 at one of the Southwestern directionals. Work is progressing on the "plant" on Hwy. 21 with a lot of fabrication going on.
How far is that plant from Hwy 96, on 21 is it, is it past the railroad tracks, or pass the split , thanks for the heads up on what is happening
It's on the south side of 21 almost directly across from the old Wranglers Club. It's behind the first tree line but you can see some of it from the highway.
Joe, Plant referral is to tie in of "Hall" gathering line tie in to transmission line 300 yds. south of 21 near Hwy 21/ FM 3121 Int. near Pendleton Bridge area ( long way from Hwy. 96)
Oh, ok, yes I know where that is. Didnt realize it was that far . Thanks
At Hwy. 21 plant site today. About 15 frac tanks set up and tankers hauling water from Toledo Bend for leak test to start tomorrow on 24" line to Telephone Rd. Looks like clearing on westerly Tenaska line to start very soon as clearing contractor signs have gone up to West of Hwy. 87. The 12" bore from Patroon creek to end of line compressor station near Hall location is being set up now. Large "pond" built at Telephone Rd. for water storage to be used to test the 12" line when complete. Suppose they will use water from 24" test to fill it.
Thanks again Frank!

RSS

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service