New Welll permitted in Ora Field 4/26

TOM-ROSA CORPORATION 001 A244 7145 56 00 017 22N 01W 04/26/2013

Views: 13318

Replies to This Discussion

Here's hoping for some good results. Since ANKOR is a private company, we may have trouble getting up-to-date information on the Tom Rosa. Maybe someone in the area could watch for tanker trucks removing oil from the location.

1100 bpd well allowable through Feb 4th 2014 , given this is a vertical that should be taken as a good sign

This is just for emergency clearances...about in line with everyone else and positive, but not really indicative of anything other than they have SOME product to sell. 

Any new info on the Tom Rosa #1 serial #246347 sec.17 twn22 rg1w ?

paulette1

The allowable of 1100 bpd has been extended 2/5/14/till 5/5/14. I was told they are finally fixing to start the frack job on this well.

Paul, thank you so much for the info. We have property in that area.

02/06/2014

06

9396

1/27/14, SET 5 1/2" CASING AT 9396' WITH 200 SACKS OF CEMENT. REMARKS: RAN 5 1/2" PRODUCTION CASING STUNG INTO LINER @ 9396. ORIGINAL CASING TEST FAILED. PULLED 7816. REPLACED WITH NEW 5 1/2" CASING. TEST GOOD.

 

http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2

I was told Halliburton frac'd one stage Sunday night (2-9-14) and  Ankor is now testing the well before they frac the other two stages. 

Whodat are they doing a flowback test on that 1 stage.

Ankor has applied to form a new L SMK unit in the Ora Field.  1280 acres comprised of Sections 8 & 17 - 22N - 1W

http://ucmwww.dnr.state.la.us/ucmsearch_070611/UCMRedir.aspx?url=ht...

RSS

© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service