Britt,
They are probably at 3500 ft. and setting surface pipe. They have to protect the fresh water sands before they drill deeper. They are no where near the turn.
Yes... now that I think about it, I saw a number of concrete trailers lined up, he must have said they showed up 2 weeks ago not been drilling that long
Trinidad Drilling Rig #124 reported 7 Days Drilling on 12/20.
That would be a nice drill depth in 8 days.
Hope it is true and they keep having that kind of luck with the drill.
Bernell,
The first 10,000 goes quickly. When they did the well on my home property they drilled to 10,500 in 10 days. That included driving the conductor pipe and setting surface pipe to 3,000 ft. Then drilling starts getting slower the deeper you drill.
Rate Of Penetration (ROP) slows when the driller stops drilling and starts sliding.
Yes, Skip and Joe, I understand all that...it is still a nice drill depth in 8 days and I still hope their luck holds.
Bernell, my comment is not about the depth drilled to date in the vertical. It is a comment about how the ROP will slow from here on as the driller kicks off to build the curve.
Trinidad Drilling Rig #124 reported 14 days drilling ahead, 12/27.
I was told it was at 11,400' this morning.
386 members
27 members
455 members
440 members
400 members
244 members
149 members
358 members
63 members
119 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com