Mainland Resources, is progressing with the planning and design of the completion program for the Burkley-Phillips #1 well drilled in Jefferson County, Mississippi, allowing the Company to flow test the well and further determine its resource potential.
Mainland previously announced on February 23, 2011 that it had retained the services of Stephen Schubarth to design and supervise the hydraulic fracture treatment ("frac") of its Burkley-Phillips #1 Well in Jefferson County, Mississippi.
Mainland CEO Mike Newport states, "Mr. Schubarth has commenced the work on the "frac" for the well. The current design is being structured to address three(3) different reservoir zones, extending from the Knowles Lime through the Bossier/Haynesville Shale and will be designed to connect as many of the shales together as possible for an optimal production rate."
Notably, Mr. Schubarth consulted directly with Leor Energy on designing the fracture stimulation for its Amoruso Prospect, which was a very successful Bossier reservoir play in East Texas. Leor had acquired mineral leases in East Texas in early 2003, and eventually sold its Deep Bossier interests, including the Amoruso Prospect, to a subsidiary of Encana.
The Company believes that Mr. Schubarth's experience with the Amoruso Field will benefit the Company given that Amoruso has several similarities to Mainland's Mississippi Buena Vista Prospect. The gas-bearing reservoir in both areas is within the Late Jurassic period and has a thickness of 2000 to 3000 feet. The succession consists of stacked shales and porous sandstones trapped within a very high pressure, high temperature environment. Amoruso was also developed by drilling vertical wells with fracture design and treatment expected to be similar to that needed at Buena Vista.
Mr. Schubarth has nearly 30 years of experience with companies including Halliburton Energy Services, Chevron U.S.A., Inc., and Arco Oil & Gas. His expertise includes Production and Reservoir Engineering, well completion design and production enhancement.
Additionally, the Company has requested bids from several industry leading companies to execute the frac stimulation and will select a provider from bids received.
Mainland is in the process of ordering completion equipment and has sourced longer lead equipment, including production casing, wellhead, tubing and other surface facilities to be installed on the well. They are also working on orders for the production packer and various other down-hole items required at and for completion.
Mainland expects to commence completion operations during the third quarter of 2011 and anticipates a timeline of approximately three to five weeks.
With the first time mention of stacked "porous" sandstone, I believe that prior to frac they may be able to drill stem test producible amounts of gas.... after stimulation it may be multiples of that.... to me the latest was a very confident press release.... the negative is the time to undertake the initial completion process.
Ordering all the completion components up front is a very positive indicator of managements confidence in this project....
Right Skip...
So are you suggesting that MNLU paid God himself to make the Mississippi River flood. Next you will be saying that MNLU created new shares to pay God off for his timely efforts, further adding to your conspiracy theory...
Hey guys....take whatever position you want on this thing, but I can tell you this for a fact!....as an angel investor in many good and bad investments, I appreciate every bit of pr out of a startup. You have no idea how frustrating it is to go 4-6 weeks without some kind of info...and it happens more times than not. BS or not, a public company can not provide misleading info....so read between the lines and be happy that they are, at least, saying something. MNLU obviously wants everyone to stay interested......so why not?!? Be happy that you have something to think about vs wondering if the lights are still on (as is the case with many startups)
What is the basis for getting out while the getting is good?
Do you think that the Core Data and SLB data is falsified? Both are very highly regarded companies and have no axe to grind for Mainland... certainly they would not put their reputation on line over this well.
Mainland is a junior oil company start-up.... what do you expect from them except exactly what you are getting, its par for the course!
They spud the well last year as soon as they could get to the drill site after spring flooding.... they will attempt completion as soon as they can get the extensive equipment safely onto the site after this year's spring flooding.
Meanwhile, I'm sure a plan is formulating on the next step to develop the site...patience is a virtue.....
386 members
27 members
455 members
440 members
400 members
244 members
149 members
358 members
63 members
119 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com