We, as Doug mentioned, we have completed two horizontal Haynesville wells that are outstanding. The first one, the Oden well which we completed on December 3, produced a Bcf of gas in the first 64 days, its been on production 84 days, its averaged 15 million Mmcf during that 84 day period so it’s a horse, no question about it.
The Lattin well, the second well is equally as strong. It [inaudible] 24.2 million a day. Its produced, when it was on a 26/64th choke, we were producing at that 20 million a day, its produced about three-tenths of a Bcf in 17 days and currently producing on a 22/64th choke at about 17 million. So its an equally strong well, we chart it along with the Oden and then track almost exactly. Thus far up through last week I think we had produced, we were at a production rate of 35 million gross a day and 26 million net from the Haynesville so obviously we’re making headway.
Bill, the above is from the conference call but the following is a link to their 4th Qtr results press release that also incudes the well test information.