I understand that the Trinidad 103 rig has moved out of Section 7. They are now getting ready to frac the well. This is a true horizontal drilled Haynesville well.

Views: 70

Replies to This Discussion

So any insider news on the production yet?
Too early to tell they are just now setting up to frac it as I understand.

Could know something in the next two weeks or so. Pipeline is already laid to the site.
Does anyone know what the update is on the Haynesville well in Section 7 next to Walter Jacobs Park? Have they started to frac the well yet?
is this the Parcy Sharp 7 you are referring to in 18/15?
My New Year's Eve prediction is that Chesapeake will use the results of the Percy Sharp III well to gloat and banter for more support in the 4th Quarter - EOY Recap. I hope that the new year brings wonderful news of a XXX monster next door to me!!! Come dance with my band for New Year's Eve at Harley's Pub in Bossier City. We play from 8:00 until 1:00. This is a going to be the best no cover party in town with a delicious buffet and favors and of course, Rockhouse! Harley's Pub is located in the Heart of Bossier near the TCBY and Kobe steak house. Old Minden at Benton Road - convenient to the I-20 for the ride!
Has there been any news on the frac job on the well and do we know how the well did?
I haven't heard any real news. I do know that they are developing what appears to be a long well site road that starts in my section (section 8) and goes through at least 2 or 3 more sections adjacent to this section. I have seen truck loads of piepline going into the area so I think they are getting the pipelines in place for the sections around this one too.
Here's the current well status report - Does this tell anyone anything?

238043 PERCY ARNOLD SHARP III 7 H 001 C084 6220 01 00 09/08/2008 07/01/2008
238043 PERCY ARNOLD SHARP III 7 H 001 C084 6220 01 00 07/15/2008 09/07/2008 07/01/2008
238043 PERCY ARNOLD SHARP III 001 G104 6220 01 00 07/01/2008 07/14/2008 07/01/2008
SCOUT INFO REPORT DATE WELL STATUS MEASURED DEPTH TRUE VERT DEPTH DETAIL
12/24/2008 09 15473 WAITING ON COMPLETION
12/16/2008 09 15743 TD 12-10-08; SET 5 1/2 TO 15,742' W/ 460 SX
12/09/2008 05 15412 DRILLING
12/02/2008 05 14329 DRILLING
11/26/2008 05 13388 DRILLING
11/19/2008 05 12268 DRILLING
11/12/2008 05 10543 SET 7 5/8 TO 10,543' W/ 1310 SX
11/05/2008 05 9795 DRILLING
10/28/2008 05 8217 DRILLING
10/21/2008 05 2535 SPUD 10-17-08; SET 10 3/4 TO 1868' W/ 880 SX; DRILLING
10/19/2008 05 BOP TESTED 10-19-08 CONDUCTOR 20"X60'; HYDRILL 13 5/8 RATED 5000# TESTED 250-3500#; T-3 TYPE U PIPE RATED 10,000# TESTED 250-5000#; T-3 TYPE U BLINDS RATED 10,000# TESTED 250-5000#; T-3 TYPE U PIPE RATED 10,000# TESTED 250-5000#
07/01/2008 01 13000 700' FNL & 680' FWL OF SEC 7.
PERFORATIONS SERIAL NUM COMPLETION DATE UPPER PERF LOWER PERF SANDS RESERVOIR
WELL TESTS RPT TYP TEST DATE RPT DATE OIL POT COND GAS DEL WATER BSW% FLOW PRES SHUTIN PRES CHOKE UPPER PERF LOWER PERF BOT HOLE PRES
WELL ALLOWABLES EFFECTIVE DATE END DATE LUW CODE LUW TYPE CODE ALLOWABLE ESTIMATED POTENTIAL CURRENT ALLOWABLE TYPE
LEASE\UNIT\WELL PRODUCTION RPT DATE LUW CODE STORAGE FAC DOC USE WELL CNT OPENING STK OIL PROD(BBL) GAS PROD(MCF) DISPOSITION CLOSING STK PARISH
CASING COMPLETION DATE CASING SIZE WELLBORE SIZE CASING WEIGHT UPPER SET DEPTH LOWER SET DEPTH CEMENT SACKS TEST PRESSURE HOURS UNDER PRESSURE TEST DATE CASING PULLED CREATION PROCESS
12/14/2008 0512 0634 23 0 15743 460 0 0 WELL HISTORY
12/14/2008 0758 0978 29.7 0 10543 1310 3000 .5 11/10/2008 WELL HISTORY
12/14/2008 1034 13.5 45.5 0 1868 880 1500 .5 10/20/2008 WELL HISTORY
PLUG AND ABANDON
This is probably out dated data. I am unsure if they have frac'd the well at this time but I am assuming that they have and that the well is on line. Three weeks ago they had all of the pipeline laid frrom section 7 to section 8 and looked like they were building compressor station on section 8. If this well is not on line it is not far off.
I understand that they are getting ready to frac the well. Not sure the exact time frame but they are getting the water ready.
So we know if they have completed the frac job on the Sharp well? IF so when should we find out about the well?
I wonder if one of the two wells mentioned below is the Sharp Well? From a news release on the 27th by Chesapeake:

The company continues to experience attractive drilling results in the Haynesville Shale play in Northwest Louisiana and East Texas. The company's last seven horizontal wells have had gross initial production or test rates averaging approximately 16 mmcfe per day and its two most recent wells, which are currently waiting on pipeline connection, tested in excess of 22 mmcfe per day. Chesapeake is currently operating 20 rigs in the play and anticipates operating an average of approximately 25 rigs in the play during 2009.

RSS

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service