Becky, Cayenne GU #1H was completed mid-January with an IP of 4.304 MMcfd on a 10/64 choke with a 9250# flowing pressure. The production so far:
Jan. (part)- 73,099 mcf
Feb. - 126,669 mcf
Mar. - 125,970 mcf
307 members
409 members
286 members
6 members
49 members
© 2026 Created by Keith Mauck (Site Publisher).
Powered by