It is time for the Mississippi site to have the discussions about Mississippi wells.
There are 5 new pending permits and petitions before the board--two by Goodrich and 3 by EnCana.
There is a South offset to the Crosby Well and a proposed a well to the SE in 2N 1E. These are in Wilkinson.
EnCana has proposed 2 wells adjacent to each other north of the Ash Wells in Amite.
There is also a proposed well in Sections 5 and 8 in 1N 4E in Amite.
The procedure so far has been to get a force integration permit--to force the landowners to lease; then not drill the wells immediately. (This is an abuse, particularly by EnCana, by which they use the force integration statute to help get the prospect leased--then they don't drill before the force integration permit expires. They drill instead when they are good and ready.)
But, being in a unit is a hell of a good start even if it doesn't get drilled immediately--and it looks like poor ole Mississippi is getting more than its share of permits.
Tags:
Thanks.
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
386 members
27 members
455 members
440 members
400 members
244 members
149 members
358 members
63 members
119 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com