East Texas Drilling Report for Nov. 19
(For activity Nov. 5-11)
DEVELOPMENTAL
(County; Operator; Lease/Well; Field; Survey; Type; Depth; Location)
Panola; Sheridan Production Co. LLC; Hebert 3; Carthage (Travis Peak); Hanks, I/271; Oil/Gas; 6,900; 3 Miles SW Carthage
COMPLETIONS
(County; Operator; Lease/Well; Field; Depth; Choke Size; Flow Rate (24 Hrs.); Location)
Panola; R. Lacy Services Ltd.; Harold Wilson 1; Briggs (Upper Travis Peak); 9,925; Open; 15 Bbls/55 Mcf; 6.25 Miles NE Beckville
Panola; Sheridan Production Co. LLC; Hull Unit A-A38; Carthage (Pettit, Lower Gas); 9,660; 1; 98 Mcf; 5.5 Miles E Carthage
Panola; Sheridan Production Co. LLC; Wilson Unit 9; Carthage (Pettit, Lower Gas); 9,650; 1.250; 777 Mcf; 2.4 Miles E Carthage
Tags:
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
400 members
9 members
120 members
97 members
34 members
386 members
27 members
455 members
440 members
244 members
© 2025 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com