The latest report for well 243536, section 4-8-12, says drilling, problem with 7 5/8 casing. Is this something that the drilling crew can resolve? Also, there are several references to BOP testing. Do all wells have this testing, this is the first time I have seen it in a report.
Tags:
307 members
409 members
286 members
6 members
49 members
© 2026 Created by Keith Mauck (Site Publisher).
Powered by