As more members become recipients of royalty based on the linear feet of perforated lateral within their unit from Cross Unit Lateral Wells (HC), questions arise about the means by which production is allocated to their unit. The following is the best example I have run across to date to illustrate how this is reported. The first link is the "perforation letter" from Brammer Engineering on behalf of the operator to the state (in this case MRD Operating). The second link is to the Permit To Drill which contains the well plat showing the horizontal wellbore path in each contributing unit (see page 5).
http://ucmwww.dnr.state.la.us/ucmsearch/UCMRedir.aspx?url=http%3a%2...
http://ucmwww.dnr.state.la.us/ucmsearch/UCMRedir.aspx?url=http%3a%2...
Tags:
Thanks for sharing, Skip, and a Merry Christmas to you and your family.
Hobbs
You're welcome, Hobbs. Merry Christmas to you and yours in return.
11 members
458 members
151 members
195 members
19 members
406 members
252 members
388 members
174 members
68 members
Posted by Char on May 29, 2025 at 14:42 — 4 Comments
© 2026 Created by Keith Mauck (Site Publisher).
Powered by