This 3 well/unit drilling program appears to be a very well thought out program. It will test the AC from just North of the shelf to the MS/LA state line. This should give them excellent basic information about the formation over a very wide area. The next step is to see what they plan as for the actual drilling, completion and stimulation of the formation. Will they drill, complete and stimulate as a sand/shale well or will the they use practices more towards the unique characteristics of the AC. Time will tell. Again, An interesting drilling program that will yield a lot of information.
Tags:
McKowan #1 frac 40 stages. see bottom entry on link. Is 40 alot, a little or typical?
http://sonlite.dnr.state.la.us/sundown/cart_prod/cart_con_wellinfo2...
WELLS
SERIAL | WELL NAME | WELL NUM | ORG ID | FIELD | PARISH | PROD TYPE | SEC | TWN | RGE | EFFECTIVE DATE | API NUM |
---|---|---|---|---|---|---|---|---|---|---|---|
251215 | AUS C RA SUA;MCKOWEN | 001 | C298 | 3950 | 19 | 00 | 058 | 03S | 01W | 08/14/2018 | 17037201590000 |
PRMT DATE | SPUD DATE | STAT DATE | ST CD |
---|---|---|---|
08/14/2018 | 08/14/2018 | 01 |
WELL SURFACE COORDINATES
Surface Longitude | Surface Latitude | Lambert X | Lambert Y | Ground Elevation | Zone | Datum |
---|---|---|---|---|---|---|
0-0-0 | 0-0-0 | 2029561 | 762277 | 156.7 | S | NAD-27 |
WELL SURFACE COORDINATES GENERATED BY DNR
UTMX 83 | UTMY 83 | LONGITUDE 83 | LATITUDE 83 | |
---|---|---|---|---|
668510.86838057 | 3404656.77342429 | -91.23933454 | 30.76295802 | View GIS |
BOTTOM HOLE COORD
EFFECTIVE DATE | END DATE | PLUGBACK TOTAL DEPTH | TRUE VERTICAL DEPTH | MEASURED DEPTH | LAT DEG | LAT MIN | LAT SEC | LONG DEG | LONG MIN | LONG SEC | COORDINATE SOURCE | LAMBERT X | LAMBERT Y | ZONE | COORDINATE SYSTEM |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
08/14/2018 | 15500 | 17500 | 02 | 3307971 | 817315 | S | 02 | ||||||||
08/14/2018 | 15500 | 17500 | 02 | 2027173 | 756605 | S | 01 |
WELL HISTORY
SERIAL | WELL NAME | WELL NUM | ORG ID | FIELD | ST CD | PT | WELL CLASS | EFF DATE | END DATE | STAT DATE |
---|---|---|---|---|---|---|---|---|---|---|
251215 | AUS C RA SUA;MCKOWEN | 001 | C298 | 3950 | 01 | 00 | 08/14/2018 | 08/14/2018 |
SCOUT INFO
REPORT DATE | WELL STATUS | MEASURED DEPTH | TRUE VERT DEPTH | DETAIL |
---|---|---|---|---|
12/17/2018 | 05 | 18569 | DRLD LATERAL F/ 15616' TO 18569'; | |
12/10/2018 | 05 | 15616 | ATTEMPTED TO K/O CMT PLUG TO 14243'; PICK UP & SET OPEN HOLE WHIPSTOCK @ 14000' AND DRILL OFF SAME; DRILL AT LAND CURVE @ 15616'; | |
12/03/2018 | 05 | 15111 | SET BALANCED PLUG F/ 13830' TO 14830' TO KICK OFF INTO LATERAL (PUMPED 273 SXS CMT); CURRENTLY ATTEMPTING TO K/O CMT PLUG @ 14218'; TSTD BOP'S 12/1/18; | |
11/26/2018 | 05 | 15111 | TSTD CSG; PERFORMED LEAK OFF TEST; DRLD TO 15111'; RAN FORMATION EVALUATION; | |
11/19/2018 | 05 | 13817 | DRLD TO 13817'; RAN 9 5/8" CSG TO 13697' W/ 485 SXS; TSTD BOP'S 11/19/18; | |
11/13/2018 | 05 | 12600 | FORMATION INTEGRITY TEST; DRLD TO 12600'; | |
11/05/2018 | 05 | 8580 | DRLD TO 8580'; RAN 11 3/4" LNR TO 8458' W/ 1188 SXS CMT, TOL @ 3648'; TSTD BOP'S 11/3/18; TSTD CSG; | |
10/29/2018 | 05 | 6900 | CEMENTED 13 3/8" CSG TO SURFACE W/ 1738 SXS CMT; ND DIVERTER; NU & TSTD BOP'S 10/24/18 (BOP INFO: ANNULAR, SPHERICAL, 13 5/8", BOSS, 5000; RAMS: TYPE U, 13 5/8", BOSS, 10000); TSTD CSG & FORMATION; DRLD TO 6900'; | |
10/22/2018 | 05 | 3790 | DROVE 20" TO 319'; SPUD 10/17/18; DRLD TO 3790'; RAN 13 3/8" CSG TO 3790'; (DIVERTER INFO: ANNULAR, 21 1/4, DUAL 8", 2000 PSI) | |
08/14/2018 | 01 | 17500 | S 29 D 43' 38" W 21,095.08' FROM USC&GS MONU. "KARR 2 1978", LOC IN SEC 58-T03S-R01W. PBHL:S 22 D 49' 56" W 6,153.63' FROM SURF LOC & LOC IN SEC 61-T3S-R1W. |
PERFORATIONS
SERIAL NUM | COMPLETION DATE | UPPER PERF | LOWER PERF | SANDS | RESERVOIR |
---|
WELL TESTS
RPT TYP | TEST DATE | RPT DATE | OIL POT | COND | GAS DEL | WATER | BSW% | FLOW PRES | SHUTIN PRES | CHOKE | UPPER PERF | LOWER PERF | BOT HOLE PRES |
---|
WELL ALLOWABLES
EFFECTIVE DATE | END DATE | LUW CODE | LUW TYPE CODE | ALLOWABLE | ESTIMATED POTENTIAL | CURRENT ALLOWABLE TYPE |
---|
LEASE\UNIT\WELL ASSOCIATION HISTORY
EFFECTIVE DATE | END DATE | LUW CODE | LUW TYPE | LUW NAME | REPORTING PCT | PRIMARY LUW FLAG |
---|
LEASE\UNIT\WELL PRODUCTION
RPT DATE | LUW CODE | STORAGE FAC | DOC USE | WELL CNT | OPENING STK | OIL PROD(BBL) | GAS PROD(MCF) | DISPOSITION | CLOSING STK | PARISH |
---|
CASING
COMPLETION DATE | CASING SIZE | WELLBORE SIZE | CASING WEIGHT | UPPER SET DEPTH | LOWER SET DEPTH | CEMENT SACKS | TEST PRESSURE | HOURS UNDER PRESSURE | TEST DATE | CASING PULLED | CREATION PROCESS |
---|
PLUG AND ABANDON
P and A DATE | LOCATION TYPE | CASING CUT TYPE | CASING CUT DEPTH | MUD WEIGHT LEFT | COMMENTS |
---|
PLUGS
PLUG TYPE | UPPER PLUG DEPTH | LOWER PLUG DEPTH | SACKS OF CEMENT | SLURRY WEIGHT |
---|
TUBING AND PACKERS
COMPLETION DATE | TUBING SIZE | TUBING LOWER DEPTH | TUBING UPPER DEPTH | PACKER DEPTH |
---|
WORK PERMITS
REFERENCE NUMBER | APPLICATION DATE | EXPIRATION DATE | WORK PERMIT TYPE | WORK PERMIT STATUS | WORK PERMIT STATUS_DATE | TOTAL DEPTH | WORK_PERFORMED | DOCUMENTATION RECEIPT DATE | TEST SAND | WORK DESCRIPTION |
---|---|---|---|---|---|---|---|---|---|---|
L # 0652-18 | 08/27/2018 | 09/25/2019 | DEEPEN (DRILLING) | APPROVED | 09/25/2018 | 22000 | N | INV # 1178255 | DEEPEN WELL FROM PERMITTED MD 17500' TO 22000'. | |
L # 0817-18 | 12/13/2018 | 12/17/2019 | HYDRAULIC FRACTURE STIMULATION | APPROVED | 12/17/2018 | 20750 | N | AUSTIN CHALK INV # 1185242 | COMPLETE THE MCKOWEN 1 FROM 15300'-20665' MD WITH MULTIPLE HYDRAULICALLY FRACTURED STAGES USING THE PLUG AND PERF METHOD. THE STINULATION WILL CONSIST OF 40 STAGES WITH A TOTAL OF 17,200,000 LBS OF PROPPANT AND 240,000 BBLS OF FLUID. |
Robert, the completion design is generally in line with what I see for horizontal plug and perf Haynesville Shale wells. I'll leave it to others to comment on how that may be different for an AC well completion. The perforated lateral length is 5365'. Each frac stage would be about 134'. Slightly longer than the current average for Haynesville wells which is about 100'. The proppant load would be about 3205 lbs./foot which is comparable to the volume of sand used in latest design Haynesville wells.
Thank you.
Anyone have an update on this well? I"ve viewed Sonris but unfortunately don't understand a lot of the information it shows.
Bill, I suggest you go to the main McKowen discussion. It is much more current than this older discussion. Use this link,
https://gohaynesvilleshale.com/group/east-feliciana-parish/forum/to...
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
386 members
27 members
455 members
440 members
400 members
244 members
149 members
358 members
63 members
119 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com