Encana has just finished drilling the Anderson 17H-1 in Amite County, Mississippi. The well, originally permitted for 19,117' with a TVD of 12,220', reached a total measured depth of 19,547'. Drilling of the well only took 39 days which represents a significant increase in drill time and cost reduction. The lateral length calculates to be 7,327 ft which is a TMS record. Encana continues to be the aggressive leader in the TMS play. An offset, the Anderson 18H-1, is currently setting surface casing.
http://tuscaloosatrend.blogspot.com/2012/01/encana-raises-drilling-bar.html
Tags:
386 members
399 members
119 members
8 members
97 members
59 members
242 members
172 members
455 members
87 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com