Just found this permit application for Lacour 43.
PUBLIC NOTICE - - - In accordance with the laws of the State of Louisiana and the particular reference to the provisions of LA R. S. 30:4, and the provisions of Statewide Order No. 29-B as amended and adopted by the Office of Conservation of the State of Louisiana Anadarko E&P Company LP P. O. Box 1330 Houston, Texas 77251 832-636-3315 is applying to the Injection and Mining Division of the Office of Conservation for a permit to dispose of producing fluids generated from oil and gas production by means of an injection well, which is identified as Lacour 43 SWD Well No. 1, Serial Number (NA), with the injection interval at an approximate depth of 3365 ft. to 4395 ft. The well location is Section 43, Township 3S, Range 8E, Lacour Field, Pointe Coupee Parish, Louisiana. All interested parties are hereby given an opportunity to submit written comments no later than fifteen (15) days from the date of this publication. Identify the well when corresponding. Direct comments to: Office of Conservation Injection & Mining Division P. O. Box 94275 Baton Rouge, LA 70804-9275 Re: Comments for SWD Application 4513457-aug 9-1t - PUBLIC NOTICES/CONSERVATION
Tags:
REPORT DATE | WELL STATUS | MEASURED DEPTH | TRUE VERT DEPTH | DETAIL |
---|---|---|---|---|
10/24/2011 | 05 | 20140 | SLIDE, ROTATE DRLD & MWD SURVEY DRLG; LAST BOP TST 10/16/11; |
REPORT DATE | WELL STATUS | MEASURED DEPTH | TRUE VERT DEPTH | DETAIL |
---|---|---|---|---|
10/31/2011 | 05 | 21994 | DRLD TO 21994'; |
bulldog
I just looked at the permit for Lacour 43 and it states the permited depth at 22200. Does this mean they are close to ending the drilling? Will they go past the permitted depth if needed?
Does the rig now move to Lacour 42? If so how long would it take?
I heard they were going to Rabalais next but your guess is as good as mine. None of these are in our area. I just heard it in passing checking on things in our part of the world.
As far as moving a rig goes it depends on if the next site is ready. They can tear one down and move it in a week if everything is good to go.
I find it hard to believe they are going to Rabalais given the proximity of 42 and the fact that the permit for 42 expires in 6 weeks. Rabalais was just permited and should have plenty of time to drill. Just a guess, I have not read the Rabalais permit yet.
Back in the North Bayou Jack Field. 35 1S 6E.
386 members
27 members
455 members
440 members
400 members
244 members
149 members
358 members
63 members
119 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com