The well was flowed back at a rate of 15 mmcf/d at 8000# FCP. It has been flowing about a month and the water trucks have quit coming to pick up the recovered frac water.
How long until they will shut the well in and install the production tubing?
At this point why even run tubing?
Tags:
307 members
409 members
286 members
6 members
49 members
© 2026 Created by Keith Mauck (Site Publisher).
Powered by