The well was flowed back at a rate of 15 mmcf/d at 8000# FCP.  It has been flowing about a month and the water trucks have quit coming to pick up the recovered frac water. 

How long until they will shut the well in and install the production tubing?

At this point why even run tubing?

Views: 59

Reply to This

Replies to This Discussion

Jack, normally they install the production after a well has been producing ~ 2-4 months. You need the production tubing to maintain velocity as the well flow rate declines.

By the way, congratulations on a great well.
Congtrats to Jack Blake!
Jack, I would like to get a signature loan.

RSS

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service