I am a UMI in a well in section 33, T16N, R15W.

 

The well log on SONRIS says it started "Flowing to Sales" on 1/11/10.  The next report on 1/27/10 says "Well Potentialed".  How long should it be before results for this well are reported?

 

Also, I will need to follow up my original letter that was sent at the time the well was spud.  I understand that a follow up letter needs to be sent 90 days after the completion of the well (per 30.103.1).  Would that date be from the time the well was listed as waiting on pipeline (reported 12/14/09 but presumably completed by then), or when it was flowing to sales (1/11/10), when it was reported as "potentialed" (1/27/10) or when the flow rate and state potential are reported?

 

Views: 66

Reply to This

Replies to This Discussion

ET, I would say the well was "completed" on 12/14/09 or maybe 1/11/10 at the latest. I assume you mean the operator has to send you information within 90 days of the completion.

Sonris may not have the test results for a few weeks as it takes some time for the information to get uploaded into the system.

RSS

Support GoHaynesvilleShale.com

Blog Posts

History of GoHaynesvilleShale

The History of GoHaynesvilleShale.com

GoHaynesvilleShale.com (GHS) was launched in 2008 during a pivotal moment in the energy industry, when the Haynesville Shale formation—a massive natural gas reserve lying beneath parts of northwest Louisiana, east Texas, and southwest Arkansas—was beginning to attract national attention. The website was the brainchild of Keith Mauck, a landowner and entrepreneur who recognized a pressing need: landowners in the region had little access to…

Continue

Posted by Keith Mauck (Site Publisher) on May 21, 2025 at 6:00

Not a member? Get our email.

Groups



© 2025   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service