I am a UMI in a well in section 33, T16N, R15W.
The well log on SONRIS says it started "Flowing to Sales" on 1/11/10. The next report on 1/27/10 says "Well Potentialed". How long should it be before results for this well are reported?
Also, I will need to follow up my original letter that was sent at the time the well was spud. I understand that a follow up letter needs to be sent 90 days after the completion of the well (per 30.103.1). Would that date be from the time the well was listed as waiting on pipeline (reported 12/14/09 but presumably completed by then), or when it was flowing to sales (1/11/10), when it was reported as "potentialed" (1/27/10) or when the flow rate and state potential are reported?
Tags:
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
9 members
120 members
97 members
34 members
386 members
27 members
455 members
440 members
400 members
244 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com