Trinidad Drilling Rig 125 reported 8 days Drilling Ahead, 10/10.
The rig spud the #2 well on 10/24. Since we now have Trinidad 125 drilling two well sequentially I have changed the discussion title to include both wells, #1 & #2.
Trinidad Drilling Rig 125 reported 11 days Drilling Ahead on the #2, 10/24.
Hi Skip! What does the phrase "reported 8 day Drilling Ahead" mean? Also, I thought #2 spud on 9/30 and #1 on 10/2 or 3.
"Drilling Ahead" basically translates as normal operations. It's most often actual drilling but can include tripping pipe (bringing the bit up out of the hole for any number of reasons), conditioning the bore hole, running casing, cementing casing, logging, coring, etc. The 8 days is the number of days since spud (the day the bit hits the dirt). There will be relatively minor discrepancies in weekly reports owing to different drillers (persons) making the report for a particular rig and especially in these cases where the rig is sliding back and forth between two wells being drilled at the same time. I learned long ago to ignore these kinds of discrepancies because 99% are of no consequence. The value of the rig report is largely knowing when a rig has begun drilling and when it is finished drilling because state databases are not designed to report drilling activity on a timely basis. Quite often a rig spuds a well, drills it and is gone before the spud report ever shows up on a state database. I could fill up pages here listing the un-drilled well permits but they are of little import until a rig spuds and they become a well instead of a piece of paper.
Trinidad Drilling Rig 125 reported 18 days Drilling Ahead on the #2, 10/31.
Trinidad Drilling Rig 125 reported 25 days Drilling Ahead on the #2, 11/7.
Trinidad Drilling Rig 125 reported 32 days Drilling Ahead on the #2, 11/14.
Encana Longleaf 29H-1 and -2, located off Tobias Lane off of Hwy 584 roughly 3 miles southeast of Liberty. Trinidad Rig # 125 spud -2 on September 30 and -1 on 10/4. -1 has intermediate cemented in place. -2 reached total depth Monday, November 10. Drilling progressing well.
Trinidad Drilling Rig 125 spud the #1 well 11/13 and reported 9 days Drilling Ahead, 11/21.
Trinidad Drilling Rig 125 spud the #1 well 11/13 and reported 16 days Drilling Ahead, 11/28.
Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…
ContinuePosted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40
9 members
120 members
97 members
34 members
386 members
27 members
455 members
440 members
400 members
244 members
© 2024 Created by Keith Mauck (Site Publisher). Powered by
h2 | h2 | h2 |
---|---|---|
AboutAs exciting as this is, we know that we have a responsibility to do this thing correctly. After all, we want the farm to remain a place where the family can gather for another 80 years and beyond. This site was born out of these desires. Before we started this site, googling "shale' brought up little information. Certainly nothing that was useful as we negotiated a lease. Read More |
Links |
Copyright © 2017 GoHaynesvilleShale.com