This discussion is continued from the Mississippi Minerals Owner Group.

http://www.gohaynesvilleshale.com/group/mississippi/forum/topics/ec...

Views: 932

Replies to This Discussion

Trinidad Drilling Rig #125 spud 5/1 reports 9 days Drilling Ahead, 5/9/14.

Trinidad Drilling Rig #125 reports 16 days Drilling Ahead, 5/16/14.

Trinidad Drilling Rig #125 reports 23 days Drilling Ahead, 5/23.

# 2

Thanks for the correction, CF.  #1 is in completion ops and #2 should be nearing TD.

Always look forward to your rig reports ... thanks for all you do !

You're welcome, CF.  I got behind the power curve when I lobbied Keith to give wider coverage to the TMS Play and added the new parish and county groups.  I knew there were a number of wells permitted but had no idea just how many until I started a tracking spreadsheet.  I'm hopefully about to get caught up.  Just in time for the next wave of 15 wells which will give us a lot more detail as to the state of the TMS. 

Trinidad Drilling Rig #125 reports 30 days Drilling Ahead, 5/30.

Trinidad Drilling Rig #125 reports 37 days Drilling Ahead, 6/6.

Trinidad Drilling Rig #125 reports 44 days Drilling Ahead, 6/13.

I am hearing a rumor that she's a very good well.  Anyone else hearing the same thing?

 

The Form 3 for the Lyons 35H #2 has been entered in the MS O&G Board database.  Good well.

Initial production:  1516 BOE/D (1337 BO/1075 MCF).

RSS

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service