Ensign Drilling SW Rig # 753 is reported Assigned with projected spud date 5/1, 4/25/14.

Views: 1809

Replies to This Discussion

Ensign Drilling SW Rig # 753 is reported Assigned with projected spud date 5/6, 5/2/14

Excerpt from GDP presentation, May 6:

  • The Company is currently drilling its SLC, Inc. 81H-1 (66.7% WI) well in West Feliciana Parish, Louisiana and will commence drilling operations on its Bates 25-24H #1 (97.6% WI) and Denkmann 33-28H #2 (75% WI) wells in Amite County, Mississippi in the coming days.

Ensign Drilling SW Rig # 753 is continuing to report Assigned, projected spud date 5/11/14.

Ensign Drilling SW Rig # 753 spud 5/12, reports 5 Days Drilling @ 3350', 5/16/14.

Ensign Drilling SW Rig # 753 reports 12 Days Drilling Ahead @ 10107', 5/23.

Ensign Drilling SW Rig # 753 reports 19 Days Drilling Ahead @ 10980', 5/30.

Ensign Drilling SW Rig # 753 reports 26 Days Drilling Ahead @ 11,864', 6/6..

Ensign Drilling SW Rig # 753 reports 33 Days Drilling Ahead @ 14694'', 6/13.

Ensign Drilling SW Rig # 753 reports 40 Days Drilling Ahead @ 15205', 6/20.

Ensign Drilling SW Rig # 753 reports 47 Days Drilling Ahead @ 16213', 6/20.

Ensign Drilling SW Rig # 753 reports 54 Days Circulate, 7/3.  Rig assigned to the Kent 41H, projected spud date 7/11.

Skip, 54 days seems like a long time, is circulating good or bad, what does this mean? How long does it circulate after drilling is done? Thanks.

RSS

Support GoHaynesvilleShale.com

Blog Posts

The Lithium Connection to Shale Drilling

Shale drilling and lithium extraction are seemingly distinct activities, but there is a growing connection between the two as the world moves towards cleaner energy solutions. While shale drilling primarily targets…

Continue

Posted by Keith Mauck (Site Publisher) on November 20, 2024 at 12:40

Not a member? Get our email.

Groups



© 2024   Created by Keith Mauck (Site Publisher).   Powered by

Badges  |  Report an Issue  |  Terms of Service